- All lines except 132 KV Puri - Nimapara restored. Power
supply available at Puri
and Nimapara
from alternate sources.
- Power supply restored : Puri - 90%, Khurda - 96%,
Bhubaneshwar - 70%, Ranasinghpur - 86%, Paradip - 40%,
Pattamundai - 46%,
Berhampur - 84%
and Kendrapara -
8%.
- Peak demand of GRIDCO
is less by
only 70 MW
Television and Radio
Network
- All India Radio transmission has been restored
to normalcy at all stations except in Cuttack where a 10 KV medium wave
transmitter has been set up from 14.11.1999, pending repair to the 100 KV
medium wave transmitter.
- 7 out of 10
affected TV stations have been set right. Transmitters at Kendrapara, Cutack
and Jagatsinghpur are likely to be operational from 15.12.1999.